×

Bid for Maintenance and Repair of CDCR’s Supervisory Control System in Solano Prison – Walk-through Required by April 5, Deadline to Submit Bids is May 7″.

Quotes Needed for Water Treatment Technology Services by CDCR

Bid for Maintenance and Repair of CDCR’s Supervisory Control System in Solano Prison – Walk-through Required by April 5, Deadline to Submit Bids is May 7″.

The California Department of Corrections and Rehabilitation (CDCR) has released a Request for Quotation (RFQ) for maintenance, calibration, inspection, and repair services for the Supervisory Control and Data Acquisition (SCADA) system at the California State Prison, Solano water treatment plant. The performance period for this agreement is from July 1, 2024, to June 30, 2027, with an initial agreement not exceeding $180,000.

Interested vendors are required to participate in a mandatory walk-through of the facility before submitting a quote package. Walk-throughs must be scheduled through Martha Gallegos and Billy Ray Butler before April 5. The deadline to submit a bid package is 2 p.m. on May 7. Ashley Koewler is the point of contact for this RFQ.

If it is deemed in the best interest of the CDCR, the resulting agreement may be amended to extend the term and/or increase the funding consistent with the original Scope of Services. Interested vendors should ensure they complete the walk-through and submit their bid packages on time to be considered for this opportunity.

You May Have Missed